Holy smokes... renovation is 100% underway at our house and I tell you what - our contractors don't waste time. Our whole main floor is gutted down to the studs. Exciting but
very dusty. I'm sure I'll be vacuuming our upstairs daily for the next 6 weeks.
I'm sure you are all curious about our official renovation game plan so over the next couple of weeks, I'll take you through our main floor one space at a time. The over all goal is to add a guest bedroom, 3/4 bathroom and create an open concept floor place without putting an addition on the house. Do-able? Yes.
To start - here is a look at what used to be Adam's office. This will become a guest bedroom. (He now shares the
basement office with me. Lucky Guy!!)
Here is (sort of) a before picture.
Here is a look at our "structural" game plan.
My husband, being the ambitious guy that he is, got excited and started breaking through walls.
Structural plan
Remove Trim - replace with new
Tear out plaster and lath walls - replace with sheet rock
Tear out ceiling - replace with sheet rock
Tear out the flooring - replace with carpet
Center heat vent under the window
Move the heat duct to the inside of the wall
Close the doorway that used to lead to laundry room - this will become a full wall.
(laundry room will become a bathroom)
Cosmetic Plan
Repaint with a medium-dark gray
Accent with white, coral, and light gray
Add a light fixture
Standard bedroom furniture
My cosmetic plan will come to life through a design board so stick around to see it. Did you notice I was testing out a paint color already? It was just a little bit dark for this room.